Hinton House, Warrington                                                            

PROJECT TYPE

Design, Furniture & Fit-out

Hinton House in Warrington has been on a journey of refurbishments, spanning over 20 projects within a six-year period, creating people centred workspace with the aim of creating a more adaptable and vibrant work environment, catering to diverse working preferences and requirements. 


DURATION

9 Weeks

DATE

2023

Sector

Nuclear

Maximum Daylight, Maximum Impact

The projects have encompassed various aspects such as engineering, design, programming, legal considerations, and project management. Continuous efforts have been made to adjust and reimagine spaces to meet evolving needs, promoting smooth collaboration and productivity. Notably, a key highlight of the renovation has been the installation of a large custom collaboration table, meticulously crafted with high-quality materials to embody a contemporary aesthetic.

The strategy for optimizing space has prioritized the introduction of natural light, improving the atmosphere while defining clear work areas. Overall, the primary goal has been to blend functionality with sophisticated design elements, fostering a culture of collaboration, innovation, and employee well-being. This attention to detail extends to the choice of ergonomic furniture, ensuring that comfort and style seamlessly intersect throughout the office environment.

Previous
Previous

Albion, Whitehaven

Next
Next

Hinton House Exec, Warrington